PROJECTS EXECUTED
- 01Tanodumasi Road: 16 Km Road Project (Synohydro Project) 2017-2021
- 02Asamankese Primary Substation Construction: Overhead and Underground Cable Connection and Power Transmission Works to 22 Communities (2016-2018)
- 03Abuakwa Electrification Project (African Development Bank Funded Project): Installation of 22 Numbers, 200 KVA Transformers, 428 Poles and Distribution Lines (2016–2017)
- 04Ghana Commercial Bank-20 Branches: Installation of Fire Detection Systems, Electrical Equipment and Switch Gear ( 2014 -2015
- 05NIB Bank- Head Office, Tema Comm 9 and Adenta Branches: Transformer, Electrical Switches and Wiring (2011-2014)
- 06ADB Bank-78 branches across Ghana: Supply, Installation and Maintenance of Fire Detection and Alarm Systems (2011-2013)
- 07Premier Tower (SSNIT Property): Supply, Installation, Maintenance, CCTV, Access Control, Intruder, Fire Alarm (2001-2004)
- 08Silver Star Tower: Supply and Installation of Fire Alarm, CCTV, Intruder Alarm, Acess Control (2003-2005)
- 09Ecobank Head Office, Osu Branch: Supply, Installation, CCTV, Intruder Alarm (2006-2008)
- 10Labadi Beach Hotel: Supply and Installation of CCTV, Fire Detection Systems (2004-2006)
- 11GIHOC Distilleries: Electrical Wiring, Supply and Installation of Electrical Equipment and Switch Gear (2007–2009)
- 12SG-SSB Bank- Head Office, Premier Tower, Kaneshie and Kokomlemle Branches: Electrical Wiring, CCTV, Intruder Alarm, Fire Detection, (2008-2010)
- 13Ghana Police Service, Installation of 800 kVA Transformer, Rewiring of the Headquarters and Adjoining CID Headquarters Supply and Installation of Electrical Equipment and Switch Gear (2007-2010)
- 14The Great Lakes Camp at Kedzi in Keta (2000-2003)
- 15Normandy Mining Camp in Kenyasi Ahafo (2001-2002)
- 16Arda Turkey Construction Camp in Akim Oda (2015–2017)
